Plot No-327/2559, Omfed Back Side, C.S.Pur, Bhubaneswar-751017, Odisha

Completed Projects

SUBUDHI ASSOCIATES

DETAILS OF WORKS COMPLETED DURING LAST YEARS

Sl. No. Name of Clients Name of Projects
1 Office Of The Executive Engineer Phulbani (R&B) Division, Phulbani Survey, Investigation and preparation of DPR of the project improvement to Brahmapur- Phulbani road (SH-7) under vijayawada Ranchi Corridor from 112/0 km to 162/5 km.(45 km)
2 Office Of The Executive Engineer Phulbani (R&B) Division, Phulbani Kandhamal District,Orissa. Survey, Investigation and preparation of DPR of the project improvement to Manamunda-Kantamal-Ghantapada-Sindhiguda road (SH-41) from 21/0 km to 41/0 km.
3 Office Of The Executive Engineer Phulbani (R&B) Division, Phulbani Consultancy services for Feasibility study and preparation of DPR For Khalikot - Kodala - Budhamba - Koinphulia - Aska Road in the state of Odisha
4 Office Of The Executive Engineer Phulbani (R&B) Division, Phulbani Kandhamal District,Orissa. Survey, Investigation and preparation of DPR of the project Improvement to Banigocha Madhapur Khajuripada Phulbani Sarangada Road (SH-1) from 142/8 km to 179/0 km.
5 Office Of The Executive Engineer Jeypore (R&B) Divisin,Jeypore Survey, Investigation and preparation of DPR of the project improvement to Papdahandi-Umerkote-Yerla Road from 18.0 km to 36.0 km.
6 Office Of The Executive Engineer Angul (R&B) Division, Orissa. Survey, Investigation and preparation of DPR of the project improvement to Boinda-Athamallik-Kiakatta Road from 0.0 km to 54.0 km.
7 The Odisha Minning Corporation Ltd. Survey, Design, Estimation & Preparation of detailed project report (DPR) for developing two-lane Barsuan-Khandadhar Road in the district of Sundargarh.
8 Office Of The Executive Engineer Bhubaneswar (R&B) Division, Bhubaneswar. Consultancy service for G.A.D and structural design for the work- construction of H.L. Bridge over river Kushabhadra at Ch.12 Km of Balakati-Balianta Road
9 Office Of The Executive Engineer Baliguda (R&B) Divisin, Baliguda., Odisha Survey, Investigation and preparation of Feasibility report, DPR, Bid Document of the project "Widening and Strengthening of Kalinga-Raikia-Nuagaon Road Road (SH-7A) from 0/0 Km to 57/700 Km (57.7Km)"
10 Office Of The Executive Engineer Baliguda (R&B) Divisin, Baliguda., Odisha Survey, Investigation and preparation of Feasibility report, DPR, Bid Document of the project "Widening and Strengthening of Baliguda-Barakhama-khamanakhole-Sindhiguda Road (SH-41) from 0/0 Km to Km 47/260 Km (47.260Km)"
11 Office Of The Executive Engineer Baliguda (R&B) Divisin, Baliguda., Odisha Survey, Investigation and preparation of Feasibility report, DPR, Bid Document of the project "Widening and Strengthening of Sarangagada-Nuagaon-Balliguda Road (SH-1) from 219/0 km to 244/000 km (25.0Km) "
12 Office Of The Executive Engineer Kalahandi (R&B) Division, Bhawanipatna., Odisha Survey, Investigation and preparation of Feasibility report, DPR, Bid Document of the project "Widening and Strengthening to two laning of Bhawanipatna-Gunupur_Kashipur Road (SH-44) from 0/0 Km to Km 55/500 Km (55.500Km)"
13 Executive Engineer, NH Division, Sunabeda Consultancy Services for preparation of D.P.R. for improvement of Road (NH_326) from Km. 353/700 to Km 383/700 of Jeypore -Malkangiri.
14 Executive Engineer, NH Division, Sunabeda Consultancy Services for preparation of D.P.R. for improvement of Road (NH_326) from Km. 248/700 to Km 253/700 and Km 281/700 to Km 311/700 of Rayagada-Koraput.
15 Executive Engineer, NH Division, Sunabeda Consultancy Services for preparation of D.P.R. for improvement of Road (NH_326) from Km.327/700 to Km 353/700 of Jeypore-Malkangiri.
16 Executive Engineer, NH Division, Sunabeda Consultancy Services for preparation of D.P.R. for improvement of Road (NH_326) from Km.383/700 to Km 413/700 of Jeypore-Malkangiri.
17 Executive Engineer, NH Division, Sunabeda Consultancy Services for preparation of D.P.R. for improvement of Road (NH-326) from Km.212/700 to Km 248/700 of Rayagada-Koraput.
18 Office of the Executive Engineer, N.H.Division, Sunabeda "M/R to N.H. 326 as conducting tests of existing sub-grade soil for improvement of road (NH-326) from Km. 212/700 to Km.253/700 & Km 281/700 to 311/700 of Rayagada-Koraput Section
19 Office of the Executive Engineer, N.H.Division, Sunabeda "M/R to N.H. 326 as conducting tests of existing sub-grade soil for improvement of road (NH-326) from Km. 327/700 to Km.413/700 of Jeypore-Malkangiri Section
20 Executive Engineer, NH Division, Baripada Survey, Investigation and preparation of feasibility report,DPR, Bid Document of the project " Widening to two lane carriageway with 1.5 wide paved shoulder and stregthening from Km 35/700 to 71/400 ( Rairangpur to jasipur Section ) of NH-220 (35.700 Km) in the state of Odisha"
21 Office Of The Executive Engineer Koraput (R&B) Divisin, Koraput., Odisha Survey, Investigation and Preparation of feasibility report, DPR,Bid Document of the Project "Widening and Strengthening of Parvatipur - Laxmipur Road (SH-51) to 2- Lane carriageway without paved shoulder from 12/600 Km to Km69/230 Km (56.630 Km)''
22 Office Of The Executive Engineer Boudh (R&B) Divisin, Boudh., Odisha Survey Investigation and preparation DPR for the work" Construction of H.L Bridge over river Mahanadi connecting Boudh to ward no.13 & 14"
23 Office Of The Executive Engineer Boudh (R&B) Divisin, Boudh., Odisha Survey Investigation and preparationPR for the work" Construction of H.L Bridge over Tel on road from PWD road (SH-41) at 43/800 Km to Rakod & Phased"
24 Office Of The Executive Engineer Boudh (R&B) Divisin, Boudh., Odisha Survey Investigation and preparation DPR for the work" Construction of H.L Bridge over Mahanadi on Athamalik- Dholpur Road "
25 NTPC Ltd.Talcher-Kaniha, PO-Deepsikha. Dist-Angul, Odisha Geo-Technical investigation at distressed portion of Lagoon-II, St-I & II ash dyke of TSPTS for stability and safety checking of Dyke.
26 Garrison Engineer (I) (P) South Prothrapur,Calicut- Po Port Blair "Soil Investigation for Augmentation of Infrastucture at Neil Island and Provn of OTM Accommodation."
27 Rites Limited. Highway Division, Kolkata, Metro Railway Service Building (4th Floor), 56, CR Avenue,Kolkata (W.B) Preparation of Soil investigation work in connection with preparation of Detailed Project Report for Construction of Fly-over/ROB at (i) Railway siding Junction joining Project office to Telisingi village and (ii) Coal stock Junction joining Kaniha to Jarada village (ODR) for MCL, Kaniha Area.
28 ARSS INFRASTRUCTURE PROJECTS LTD. Sector-A, Zone-D, Plot #38, Mancheswar Industrial Estate,Bbsr,Odisha Subsoil Investigation for 700 Mtr . Approximate Depth at Gumuda, Bansadhara Bridge Site.
29 Office of the Executive Engineer,Keonjhar (R&B) Division, Keonjhar Preparation of Geotech investigation work for Construction H.L bridge over river BHANARPUR NALLAH at Ch. 35/900 km of Sat Kutunia Patna road at Keonjhar.
30 Office of the Executive Engineer,Keonjhar (R&B) Division, Keonjhar Preparation of Geotech investigation work for Construction H.L bridge over river BOINGA NALLAH at Ch. 33/400 km of Sukati-Dubuna road at Keonjhar.
31 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Topographical survey using DGPS , total station, auto level and preparation of drawings using mapping software for Kanpur & Agra Metro Rail Project
32 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Establishment of Vertical Control (Temporary Bench Marks) along proposed alignment from Kharagpur to Vijayawada via Bhadrak-Palasa_Duvvada of East-Coast Dedicated Freight corridor.
33 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Establishment of Vertical Control (Temporary Bench Marks) along proposed alignment for Sec-3 from Nagpur to Dronakal via Wardha-Ballharshah-Warangal on Delhi-Chennai Route of North - South Dedicated Freight corridor."
34 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Establishment of Vertical Control (Temporary Bench Marks) along proposed alignment for Sec-4 from Dornakal to Arakkonam via Motumari-Jaggyapeta-Vishnupuram-Nadikudi-Paduguralla-Savalyapuram-Darsi-Podili-Rapur-Venkatgiti-Renigunta Jn on North-South Dedicated Freight corridor.
35 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Topography survey for Pre-construction survey and feasibility studies for Bhanupalli-Bilaspur-Beri new rail link of Northern Railway.
36 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Topographical survey of the proposed MMLP & Container yard sites at Paradip Port.
37 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Topographical survey of the proposed corridor for Greenfield 2x660MW Supercritical TPP at village Phephar, Dist.Banswara, Rajastan
38 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey and Geotechnical Investigation for Jabalpur-Lakhonodone of NH-7 from Km 465+600 to 546+425 and Gwalior to Shivpuri of NH-3 from Km 15+600 of NH-75 (End of Gwalior Bypass) to Km 236+000 of NH-3 in the state of Madhya Pradesh
39 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation and Traffic Surveys for Bhagodara - Dhanduka - Bhavnagar Section from Km 61+400 of SH-1 to Km 189+100 of SH-36 in the state of Gujarat.
40 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation and Traffic Surveys for Orissa Border (Km 88+000) to Aurang (Km 239+800) Section of NH-6 in the state of Chattishgarh.
41 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation from from Angul (Km 112+000) - Sambalpur (Km 265+000) Section of NH-42 in the state of Odisha
42 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation and Traffic Surveys from Mangoli Chowk of NH-5 to Angul (Km 112+000) Section of NH-42 in the state of Odisha.
43 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey,from Lucknow (Km 11+500) - Sultanpur (Km 134+700) Section of NH-56 in the state of Uttarpradesh.
44 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation for six laning of Agra (Km 199/660) - Etawah Byepass (Km 323/525 Section of NH-2 in the state of Uttar Pradesh.
45 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey, Geotechnical Investigation for Etawah (Km 323+475) - Chakeri (Km 483+687) Section of NH-2 in the State of Uttarpradesh
46 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey for four laning of Sangareddy (Km 493+000) - Maharastra/Karnataka Border (Km 348+800) Section of NH-9 in the state of Andhra Pradesh and Karnataka.
47 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey for four laning Hospet (Km 299+000) - Chitradurga (Km 418+600) Section of NH-13 in the state of Karnataka.
48 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Traffic Survey for four Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301+890 to Km 428-030 Including Km 8+500 To Km 15+750 of NH 23 In the State of Orissa.
49 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Traffic Survey for six laning of Chandikhole-Paradeep Section of NH-5A from km 0+000 to Km 76+618 in the state of Orissa.
50 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Traffic Survey six laning of Aurangabad-Barwa adda Section (Km 180+00 to Km 398+750) of NH 2 in the States of Bihar/Jharkhand.
51 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Traffic Survey four laning of Amaravati to Jalgaon Section of NH-6 from Km 166+725 to Km 441+.950 in the State of Maharastra.
52 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Topographic Survey four Laning of Jalgaon-Gujarat/ Maharastra Border Section of NH-6 from Km 441+950 to Km 650+794 in- the State of Maharastra.
53 Kmc Infratech Limited. # 1-80/40/SP/58-65, Shilpa Homes Layout, Gachibowli, Hyderabad ,A.P Pre-Bid Traffic Survey and Geotechnical Investigation for Six Laning of Barwa Adda- Panagarh Section NH 2 from km 398+200 to km 521+120 in the states of jharkhand and Westbengal.
54 Executive Engineer, Megalift Projects, BBSR. Preliminary Survey for 20 Nos. of Megalift schemes (Approx 29100 Ha) under Cluster-VI & XI in Districts of Jajpur, Kendrapara & Cuttack in state of Odisha.
55 ESSEL MINING & INDUSTRIES LIMITED. "Industry House" 10 Camac Street, Kolkatta,W.B Topographical Survey of the land with block leveling of 10 mtr interval contouring with 2 mtr interval and marking grid of 100 mtr on the ground. Total Area 659.10 Acres.
56 Rites Limited.Rites Bhawan No.1,Sec-29,Gurgaon,Haryana Test Checking of Established Vertical Control (Temporary Bench Marks) along proposed alignment from HOWRAH to MUMBAI via Kharagpur-Chkardharpur-Bilaspur-Raipur-Nagpur on EAST-WEST (Howrah-Mumbai) Dedicated Freight Corridor
57 Garrison Engineer (I) (P) South Prothrapur,Calicut-PO,Port Blair-744105 Topographical Survey For OTM ACCOMMODATION at Port Blair.
58 Dy. Chief Engineer (Con), East Coast Railway,Angul,Odisha Final location survey for the proposed doubling line between Talcher-Sambalpur (85 km).Area of Land Acquisition is 93 Acres.